LUXE INTERIORS
By TakeItEasy Spaces
Philosophy The Guarantee FAQ Our Projects Refer & Earn TakeItEasy Interiors ↗ Request A Consultation

Internal draft — not yet published. This is a first-pass version of the guarantee for your review. It should not be shown to a client, printed, or referenced in any ad until you've confirmed the bracketed terms and it's had a legal read.

A Guarantee With A Checklist Behind It

The 2× Guarantee

Most guarantees are a sentence. This one is a checklist — eight specific, checkable standards. If we fail one and don't fix it, you're owed twice what you paid for that piece of work.

How It Works

Four steps, not a leap of faith

01

Standard, In Writing

Every checkpoint below is agreed in writing before work begins — part of your project's BOQ and specification, not a verbal promise.

02

Checked Jointly

Each checkpoint is inspected together with you at the relevant stage — not signed off by us alone.

03

A Real Window To Fix It

If something doesn't meet standard, we get [ 7 working days — to confirm ] to correct it before the guarantee applies.

04

2× On That Line Item

Uncorrected within that window, you're entitled to 2× the amount paid for that specific scope item.

The Standard

Eight checkpoints

Drafted against the same specification language already used across TakeItEasy BOQs — board grades, named hardware, finish quality — so every checkpoint is something that can actually be verified on site, not argued about.

01

Board & Material Verification

Every board grade (BWR / BWP / HDHMR, as specified) matches the named IS code and brand in your BOQ — verifiable against material delivery records on request.

02

Hardware Verification

Every hinge, channel and fitting matches the named brand in your BOQ. A substitution made without your written approval is a checkpoint failure, regardless of quality.

03

Finish & Surface Inspection

Laminate, PU or paint finish checked against the approved sample — consistent sheen, no visible seams on PU work, no bubbling or peeling.

04

Alignment & Fit

Every shutter, drawer and door checked for true alignment — no visible gaps beyond [ 2mm — to confirm ], smooth soft-close operation throughout.

05

Dimensional Accuracy

Executed dimensions checked against the approved 3D drawing and BOQ, within [ 5mm — to confirm ] tolerance.

06

Snag Resolution — 100%, Not "Most"

Handover happens only after every listed snag from the joint walkthrough is resolved — not the majority of them.

07

Timeline Adherence

Execution completed within the agreed timeline, unless a delay is attributable to the client and documented in writing at the time.

08

Designer & PM Continuity

The same assigned designer and project manager remain on your project from kickoff to handover, without unannounced substitution.

Why It's Scoped This Way
"

The 2× applies to the specific scope item that failed a checkpoint — not automatically to the full project value. A misaligned wardrobe shutter shouldn't trigger a payout equal to the whole home. Scoping it this way keeps the guarantee something we can actually stand behind at full strength, instead of a number that gets quietly softened the first time it's tested. If you'd rather it apply project-wide above a certain severity, that's a real option — just a different risk profile, worth deciding deliberately rather than defaulting into.

Making A Claim
Claims are raised in writing to interiors@takeiteasyspaces.com within [ 30 days — to confirm ] of handover, and reviewed jointly within [ 7 working days — to confirm ].
This mirrors the claim structure already used in the TakeItEasy refund policy — written notice, a defined response window, joint sign-off — so clients familiar with either document recognise the same standard of fairness.